STRUBLER PARK PLAYGROUND REPLACEMENT
Status
Accepting Bids
Prebid Date | 6/4/25 10:00am |
Bid Date | 6/18/25 10:00am |
Location
73 Terry Drive, Sugar Grove, IL 60554, Sugar Grove, IL 60554
ADVERTISEMENT FOR BID
STRUBLER PARK PLAYGROUND REPLACEMENT 2025
PROJECT MANUAL
NOTICE OF BID
Sealed bids for installing playground equipment and other related site work for Sugar Grove Park
District hereafter referred to as the Park District, will be received until 10 A.M. on June 18, 2025,
at which time they will be publicly opened and read aloud. Bid should be addressed to Mr. Scott
Nadeau, Sugar Grove Park District, 61 Main Street, Sugar Grove, IL 60554. All contracts for the
construction of public works are subject to the Illinois Prevailing Wage Act (820 ILCS 130/1-12).
Any bids received after this date and time will be returned unopened.
The preferred contractor shall have a current or have held a CPSI (Certified Playground Safety
Inspector), for the last certificate period with a copy of the certificate submitted with the bid. All
others may submit bids and will also be considered as determined by the District to be in its best
interests. Such decisions shall be final and not subject to recourse.
Instructions to Bidders
1 Bids shall be submitted in a sealed envelope and clearly marked:
SEALED BID
STRUBLER PARK PLAYGROUND REPLACEMENT
OPEN 10 AM JUNE 18, 2025.
2 PRE-BID MEETING:
A non-mandatory pre-bid meeting for all Bidders will be held at Strubler Playground, 73
Terry Drive, Sugar Grove, IL 60554, Sugar Grove, IL 60554 on June 4th. 2025 at 10 am,
local time. Prospective general contractors and subcontractors are invited to attend.
3 DOCUMENTS:
Printed Procurement and Contracting Documents: May be obtained commencing May 28th,
2025, by contacting reprographic house (Vesco Reprographics). Documents will be
provided to prime Bidders only; only complete sets of documents will be issued.
Online Procurement and Contracting Documents: May be obtained commencing May 28th, 2025,
by contacting Vesco Reprographics. Phone 630-896-2115. Online access will be provided to all
registered Bidders and suppliers (Vescoplanroom.com).
Viewing Procurement and Contracting Documents: May be examined commencing May 28th, 2025,
at the location below:
Owner’s Administration Office, 61 S Main St, Sugar Grove, IL 60554
4 Bids will be awarded to the lowest responsible bidder complying with the conditions and
specifications presented herein. All bids must include the specified play components and activities
as shown on the attached drawings. All prices must be itemized and totaled as shown on the bid
form. The Park District reserves the right to reject any or all bids and to waive informalities to
serve the best interest of the Park District. The lowest bid will be determined by reference to the
Base Bid, the Base Bid and Alternates or any combination thereof as determined by the District to
be in its best interests. Such decisions shall be final and not subject to recourse.
Requirements for Performance and Bid Bonds
1. A bid bond is not required for this project.
2. If a bid is accepted, a Surety Bond (aka Performance and Labor & Material Payment Bond), payable to
the Sugar Grove Park District, for not less than one hundred (100%) percent of the contract amount will
be required prior to beginning construction. A Surety Bond, payable to the Sugar Grove Park District,
for not less than one hundred (100%) percent of the contract amount is required by Statute prior to
beginning construction on all projects where the Contract Sum is $150,000 or more, and may be required
for projects $150,000 or less at the discretion of the Sugar Grove Park District. Such bonds shall include
the provision guaranteeing the faithful performance of the Prevailing Wage Act. The surety on the bond
shall be a company that is licensed by the Department of Insurance authorizing it to execute surety bonds
and the company shall have a financial strength rating of at least A- as rated by A.M. Best Company,
Inc., Moody’s Investors Service, Standard & Poor’s Corporation, or a similar rating agency.
3. If a bid is accepted, the Contractor will be required to file a written substance abuse prevention program
with the Owner for the prevention of substance abuse among its employees prior to the commencement
of the work. Said program shall be available to the general public.
Award of Contract
It is anticipated that the contract will be awarded in July, 2025. The Park District reserves the right to reject
any non-responsive or non-responsible Bids or to reject all bids and waive any informality or technicality
in any Bid in the interest of the Park District.